Olympic Games Sustainability Score Calculator

Score an Olympic Games host bid or edition on venue reuse rate, budget discipline, and post-Games legacy use — the three metrics researchers and host cities actually track.

Quick Facts

Model
Simple average of three 0–100 sub-scores: venue reuse rate, cost-overrun (inverted), legacy-use rate
Same three metrics used in academic post-Games audits (e.g. Oxford Saïd Business School cost studies) and IOC legacy reporting.

Your Results

Calculated
Venue reuse rate
-
Existing/temporary ÷ total venues
Cost-overrun ratio
-
Final cost ÷ original bid budget
Legacy-use score
-
Same as venues with confirmed reuse %
Overall sustainability score
-
Average of the three sub-scores, 0–100

Ready

Enter venue counts, costs, and legacy-use rate, then calculate.

About the Olympic Games Sustainability Score

Hosting an Olympic Games involves years of construction, billions of dollars in public spending, and a promise that the event will leave a positive legacy rather than a trail of empty stadiums. Researchers who study Olympic sustainability — including the widely cited Oxford Saïd Business School cost studies (Flyvbjerg, Budzier, and Lunn) and academic legacy audits — boil this down to three measurable questions: how much new construction did the Games require, how far did the final bill run over budget, and how many venues found a real use after the closing ceremony. This calculator turns those three answers into a single 0–100 score.

The formula

Three sub-scores, each on a 0–100 scale, are averaged with equal weight:

  • Venue reuse rate = (existing + temporary venues) ÷ (total venues) × 100. A Games that uses mostly existing arenas and temporary structures avoids stranded, single-use infrastructure. Paris 2024 reported roughly 95% of its venues were existing or temporary; Games with heavy new permanent construction score lower here.
  • Cost-overrun ratio = final cost ÷ original bid budget. A ratio of 1.00 means the Games came in on budget; 1.31 means a 31% overrun. The score converts this to points by subtracting the overrun percentage from 100 (capped at 0–100), so a Games that comes in on or under budget scores 100, and one that doubles its budget scores close to 0. Flyvbjerg's research found the average Summer Games since 1960 overran its budget by about 213% (median 120%), with Winter Games averaging around 142% (median 118%) — the combined Summer+Winter average across all Games is 172%.
  • Legacy-use rate = percentage of venues with a confirmed, funded post-Games use (professional sports tenant, public facility conversion, disassembly-and-resale plan, etc.), used directly as the 0–100 score.

Overall score = (venue reuse rate + budget score + legacy-use rate) ÷ 3. This is a transparent, equal-weighted average — not an official IOC metric — designed so every input is independently checkable against public bid books, organizing-committee reports, and post-Games audits.

Putting the inputs in context

  • Montreal 1976 is the classic cautionary tale: the city took 30 years to pay off Olympic debt after costs ran roughly 720% over the original budget.
  • Beijing's 2008 "Bird's Nest" stadium famously struggled to find a profitable post-Games tenant and now costs tens of millions annually in upkeep — a low legacy-use case despite architectural acclaim.
  • Los Angeles 1984 and 2028 are frequently cited as high-reuse benchmarks: LA 2028 organizers planned to build zero new permanent venues, relying entirely on existing arenas, stadiums, and temporary structures.
  • London 2012's Olympic Stadium was purpose-built with a documented conversion plan (it became West Ham United's home ground), an example of high legacy-use planning executed before the Games even opened.

Frequently Asked Questions

Is this the IOC's official sustainability score?
No. The IOC does not publish a single public numeric sustainability score for host cities. This calculator uses the same underlying metrics — venue reuse, cost overrun, and legacy use — that appear throughout academic Olympic-legacy research and host-city audits, combined into one transparent, equally weighted average so you can compare bids or editions on a common 0–100 scale.
Where do I find real venue counts and cost figures for a specific Games?
Host-city bid books, organizing-committee post-Games reports, and IOC "Games impact" studies list venue-by-venue construction status. Final costs and original bid budgets are tracked independently by researchers such as Bent Flyvbjerg's Oxford Saïd Business School Olympics database, which publishes both figures for every Games back to 1960.
Why does a cost overrun subtract directly from the score?
The calculator treats the overrun percentage and the budget score as a simple complementary pair: 0% overrun keeps the score at 100, and every additional percentage point of overrun removes a point, floored at 0. This mirrors how overrun is reported in the literature — as a plain ratio or percentage — rather than applying an arbitrary penalty curve.
What counts as a "temporary" venue?
A temporary venue is built specifically for the Games and fully or mostly disassembled afterward (e.g. beach volleyball stadiums, some shooting and archery venues). Because it does not become permanent, unused infrastructure, it counts alongside existing venues in the reuse-rate numerator.