Generator Fuel Runtime Calculator

Enter usable fuel and the generator’s published consumption rate at your expected load to estimate runtime and optional daily fuel cost.

gal
gal/hr
hr/day
$/gal
Enter your local price per US gallon to estimate operating cost.

Generator Runtime Formula

Generator runtime is based on the amount of usable fuel and the burn rate at the electrical load you expect to run. For a liquid-fuel generator, use compatible gallon units:

Estimated runtime (hours) = usable fuel (gal) ÷ consumption (gal/hr)
Fuel per day (gal/day) = consumption (gal/hr) × run hours per day

Use the consumption rate from the exact generator’s manual or specification table at a load close to your expected demand. Do not substitute the generator’s rated watts, engine size, or a generic fuel-use rule for the burn rate. Manufacturers often publish different consumption values at different load percentages.

Worked Example

If 5 gallons are usable and the manual lists consumption of 0.45 gal/hr at the expected load, the simple estimate is 5 ÷ 0.45 = 11.1 hours. At 12 hours of operation per day, that same rate implies 5.4 gallons per day. The calculator can also multiply that daily use by a user-entered local fuel price.

Use the Right Fuel and Load Data

Consumption depends on generator model, fuel type, load, operating conditions, and measurement basis. For a dual-fuel machine, use the table for the selected fuel. If the manual gives runtime at a known tank size and load instead of a burn rate, divide the stated usable fuel amount by that runtime to estimate an average rate for that test point; do not assume the rate stays constant at other loads.

Generac’s fuel-use guidance directs owners to use model-specific fuel consumption information; its portable-generator manual shows why fuel type and load matter. Natural-gas generators commonly report gas flow in cubic feet per hour, which is not interchangeable with liquid gallons per hour; use a separate estimate with matched units for gaseous fuel.

Planning Limits and Safe Operation

The result assumes a constant burn rate and that all entered fuel is usable. Real runtime can differ because of changing electrical load, unusable tank volume, fuel temperature, maintenance, altitude, and operating conditions. Leave a reserve for shutdown, refueling access, and changing loads rather than planning to exhaust the tank.

Run portable generators outdoors and away from doors, windows, and vents, following the manufacturer’s carbon-monoxide and fire-safety instructions. This tool is a fuel-planning estimate; it does not size a generator for connected equipment or determine safe installation, transfer-switch requirements, or code compliance.

Frequently Asked Questions

How do I calculate generator runtime from fuel?
Divide the usable fuel quantity by the fuel consumption rate at your expected electrical load, using the same volume units.
How can I estimate generator fuel cost?
Multiply the burn rate by your local price per gallon for cost per run hour. Add planned daily hours to estimate daily cost; the calculator also estimates the cost of all entered usable fuel.
Where do I find the correct fuel consumption rate?
Check the exact model’s manual or manufacturer specification for your selected fuel and load. Do not rely on a generic rate when the model data are available.
Can generator runtime change with load?
Yes. Fuel consumption usually varies with electrical load and operating conditions. Use the manufacturer rate closest to your expected load.
Can I enter natural-gas consumption?
This version uses gallons and gallons per hour for liquid fuel. Natural-gas flow is commonly listed in cubic feet per hour and needs a separate matched-unit calculation.
Is the full tank volume usable?
Not always. Enter fuel that is actually available to the engine, and keep a practical reserve for changing load and refueling constraints.